Fengyuan Steel Structure

Current Location:
Homepage
/
/
Heavy steel

Guangxi Fangchenggang Liugang Base Project Phase I, the main body and ancillary facilities of the long product system

Steel consumption(T):12000 T
Project Location: Fangchenggang, Guangxi
Structure type:Heavy steel, truss

Zhuhai Yuchai Diesel Engine Manufacturing Project (Phase I) Supporting Special Wharf Structural Engineering (Offshore Part)

Steel consumption(T):1145.14 T
Project Location: Zhuhai City, Guangdong Province
Structure type:Steel frame structure, lattice columns
Building features: 250 ton crane, lattice columns
Construction Feature:Roof truss, lattice column single weight 40 tons

Hunan Liling Ceramics Exhibition Hall

Steel consumption(T):14000 T
Construction area:127934.8 ㎡
Project Location: Hunan Province
Structure type:Steel frame structure, steel truss, grid
Construction Feature:The basement is an outsourced steel pipe column/steel box column, the ground is a steel frame structure, the roof of the exhibition hall is a steel truss, and the roof of the experience hall is a mesh frame
上一页
1
2

Contact Details

Fengyuan Steel Structure
Fengyuan Steel Structure

Address:Konggang Avenue, Fuzhou Economic Zone, Nanning, China-ASEAN

  • 手机网站 WeChat

Copyright © Guangxi Fengyuan Steel Structure Co., Ltd.  All Rights Reserved     桂ICP备13000549号-1    SEO  网站支持IPV6