Typical project

FY STEEL STRUCTURE

Typical project

FY Performance


No. Project Name Steel quantity Project location Note
1 Xintangang Factory, Republic of Mali Approximately 600 tons Mali Processing time: 2014
2 Thang Long Project, Vietnam Approximately 680 tons Vietnam Processing time: 2017
3 Steel Structure of GoerTek Factory in Bac Ninh, Vietnam Approximately 3,100 tons Vietnam Processing time: 2019
4 Cavite Warehouse, Philippines Approximately 800 tons Philippines Processing time: 2019
5 Intco Vietnam’s 6-hectare eco-friendly handicraft decoration manufacturing plant project Approximately 760 tons Vietnam Processing time: 2021
6 Fabrication and fabrication of steel structures for industrial buildings and ancillary facilities at the Xinyi Glass Industrial Park (Beihai) Approximately 9,000 tons Guangxi, Beihai Fabrication construction area: 87,000 m². Span: 34.5 m / 56 m
7 Yongning Nanning Automobile Industrial Park Project (Chant and Shenlong New Energy Vehicles) Approximately 12,400 tons Guangxi, Nanning Fabrication construction area: 133,600 m². Span: 24 m
8 Liuzhou Steel Fangcheng Port, Guangxi Steel Infrastructure Project – Package 2: Main Building / High-Speed Line Wall System No. 3, Span Insert No. 3, and Low-Span Overhead Crane Girder No. 3 / High-Speed Lines Nos. 1 and 2, High-Speed Line No. 3, Heating Furnace / Warehouse Nos. 3 and 4, etc. Approximately 13,700 tons Guangxi, Fangchenggang Fabrication construction area: 175,000 m². Span: 27 m / 30 m
9 The 150,000-ton-per-year copper smelting project of Guangxi Nam Quoc Cooperative Co., Ltd. Approximately 1,600 tons Guangxi, Chongzuo Prefabricated steel-framed factory / Multi-story frame structure (height: 51 m)
10 Thuy Truc Industrial Park Project, Fangcheng Port Economic Zone, Package 2: Standard Factories CF-2/CF-3/CF-4 Approximately 9,000 tons Guangxi, Fangchenggang Prefabricated steel-framed factory, with a construction area of 60,000 m².
11 No. 2, Xingdong Ethnic Health Park, Guizhou Province Approximately 4,500 tons Guizhou, Anshun Pipe truss structure
12 High-Grade Stainless Steel Products Industrial Park, Long Dam Industrial Park, Ngoc Lam Approximately 1,900 tons Guangxi, Yulin Prefabricated steel frame structure / 4-story steel frame structure
13 Integrated Service Complex Project, National-Level Prefabricated Architecture Industrial Park, Fumin District, Yulin City Approximately 4,500 tons Guangxi, Yulin Prefabricated steel frame structure
14 Yibao Investment Development Co., Ltd. Factory, Jingxi County, Guangxi Approximately 6,000 tons Guangxi, Jingxi Prefabricated steel frame factory
15 Mandrel Mill Workshop, 300,000-ton Pipe Manufacturing Project, Xingtan, Guangdong Approximately 2,400 tons Guangdong, Yangchun Prefabricated steel frame structure
16 Phase 1 of the Fangcheng Port Nickel Alloy Project: Main Building for Drying Lines 1 and 2, Unified Coal Storage Facility, Coal Decontamination Yard, and Auxiliary Materials Yard Approximately 1,400 tons Guangxi, Fangchenggang Prefabricated steel frame structure
17 Guangxi Shenglong Metallurgy Co., Ltd. – Projects for the renovation of rebar rolling mills, the main plant building, etc. Approximately 2,100 tons Guangxi, Fangchenggang Steel frame structure
18 Phase 2 Expansion Project of the Fangchenggang Power Plant, Guangxi Approximately 2,600 tons Guangxi, Fangchenggang Steel frame structure
19 Liuzhou Light Rail, Guangxi Approximately 1,200 tons Guangxi, Liuzhou Bridge structure
20 Steel structural works for the hydraulic assembly plant of Dongfeng Liuzhou Motor’s vehicle parts, PV and CV components. Approximately 2,500 tons Guangxi, Liuzhou Prefabricated steel frame structure
21 Welding and Pressing Complex Building, Automobile Parts Manufacturing Facility, Ha Tay Industrial Park, Wuling Liuzhou Automobile Co., Ltd. Approximately 3,000 tons Guangxi, Liuzhou Prefabricated steel frame structure
22 Liuqi Liuzhou Transportation Co., Ltd. Approximately 1,400 tons Guangxi, Liuzhou Prefabricated steel frame structure
23 Xinyang Glass Deep Processing Joint Venture, Guangxi Approximately 1,600 tons Guangxi, Nanning Prefabricated steel frame structure
24 Porsche 4S Dealer, Nanning, Guangxi Approximately 1,300 tons Guangxi, Nanning Steel frame structure, construction area of 5,000 m²
25 The 300,000-ton-per-year beer project of Budweiser InBev Beer Co., Ltd. (Nanning) Approximately 2,800 tons Guangxi, Nanning Prefabricated steel frame structure
26 Steel Structure Project for the Nanning High-Tech Industrial Zone Ecological Park Approximately 2,200 tons Guangxi, Nanning Steel frame structure
27 The 300,000-ton-per-year glass product project of Nanning Yuebo Glass Industry Co., Ltd. Approximately 1,800 tons Guangxi, Nanning Prefabricated steel frame structure
28 Specialized steel structure project for a simple industrial workshop and an outdoor steel pipe truss, part of the simple industrial workshop construction project undertaken by Dingjin Food Co., Ltd. (Khang Sifu) in Nanning. Approximately 1,100 tons Guangxi, Nanning Prefabricated steel frame structure
29 Workshop No. 1, Phase 1, South-South New Materials Deep Processing Technology Renovation Project for Electric Vehicles, Guangxi Approximately 1,800 tons Guangxi, Nanning Prefabricated steel frame structure
30 Construction Project for the Main Workshop of Baijing (Nature) Wood Flooring Co., Ltd., Guangxi Approximately 1,500 tons Guangxi, Nanning Prefabricated steel frame structure
31 Deli/Lelin Forestry Development Co., Ltd., Guangxi Approximately 2,000 tons Guangxi, Nanning Prefabricated steel frame structure
32 Production Workshop for the Two-Piece Can Project of COFCO Nanning Canning Co., Ltd. Approximately 1,100 tons Guangxi, Nanning Prefabricated steel frame structure
33 Stora Enso Guangxi Forestry and Paper Integrated Project in Beihai Approximately 1,200 tons Guangxi, Beihai Pipeline support structure
34 Chengde Beihai Nickel Co., Ltd. (Phase 4 of the Ming Nickel-Alloy Project) Approximately 1,600 tons Guangxi, Beihai Prefabricated steel frame structure
35 Overpasses 1#, 2#, 3#, and 4#, and the canopy at Beiguilin Railway Station Approximately 3,600 tons Guangxi, Guilin Steel-structured canopy for railway platforms / docks
36 New Construction Project: Phase 1 Factory Complex for Jingui Paper and Pulp Approximately 2,500 tons Guangxi, Qinzhou Prefabricated steel frame structure
37 Jiaofeng Chemical Co., Ltd., Lingshan, Guangxi Approximately 3,200 tons Guangxi, Qinzhou Prefabricated steel frame structure
38 Main Building of the Beibu Gulf Center, Qinzhou Approximately 1,000 tons Guangxi, Qinzhou Steel frame structure
39 Steel structure works for the painting workshop, the final assembly workshop, the manufacturing test workshop, and the adjustment and inspection workshop of Lishun Machinery, Qinzhou. Approximately 2,500 tons Guangxi, Qinzhou Prefabricated steel frame structure
40 SDIC Qinzhou Port Power Plant Phase 2 Project Approximately 1,500 tons Guangxi, Qinzhou Prefabricated steel frame structure
41 Project to convert land for the Modern Specialized Agricultural Demonstration Zone, the Mango Park Area in Dien Dong District— including the Comprehensive Service Building at the China Mango Trading Center and the International Exchange Center of the China Mango Exhibition Park. Approximately 2,000 tons Guangxi, Baise Steel frame structure
42 Guangyin Aluminum Co., Ltd., Baise, Guangxi Approximately 1,200 tons Guangxi, Baise Prefabricated steel frame structure
43 Hongrun Chemical Technology Co., Ltd., Guangxi: Dissolution Workshop, Synthesis Workshop, Ammonium Chloride Warehouse, Iron Dioxide Warehouse, and Precious Metals Workshop Approximately 1,100 tons Guangxi, Baise Prefabricated steel frame structure
44 China-ASEAN Agricultural Products Trading Center (Baise) (Cold Storage No. 4) Approximately 1,500 tons Guangxi, Baise Pipe truss structure