FY STEEL STRUCTURE
Typical project
FY Performance
| No. | Project Name | Steel quantity | Project location | Note |
| 1 | Xintangang Factory, Republic of Mali | Approximately 600 tons | Mali | Processing time: 2014 |
| 2 | Thang Long Project, Vietnam | Approximately 680 tons | Vietnam | Processing time: 2017 |
| 3 | Steel Structure of GoerTek Factory in Bac Ninh, Vietnam | Approximately 3,100 tons | Vietnam | Processing time: 2019 |
| 4 | Cavite Warehouse, Philippines | Approximately 800 tons | Philippines | Processing time: 2019 |
| 5 | Intco Vietnam’s 6-hectare eco-friendly handicraft decoration manufacturing plant project | Approximately 760 tons | Vietnam | Processing time: 2021 |
| 6 | Fabrication and fabrication of steel structures for industrial buildings and ancillary facilities at the Xinyi Glass Industrial Park (Beihai) | Approximately 9,000 tons | Guangxi, Beihai | Fabrication construction area: 87,000 m². Span: 34.5 m / 56 m |
| 7 | Yongning Nanning Automobile Industrial Park Project (Chant and Shenlong New Energy Vehicles) | Approximately 12,400 tons | Guangxi, Nanning | Fabrication construction area: 133,600 m². Span: 24 m |
| 8 | Liuzhou Steel Fangcheng Port, Guangxi Steel Infrastructure Project – Package 2: Main Building / High-Speed Line Wall System No. 3, Span Insert No. 3, and Low-Span Overhead Crane Girder No. 3 / High-Speed Lines Nos. 1 and 2, High-Speed Line No. 3, Heating Furnace / Warehouse Nos. 3 and 4, etc. | Approximately 13,700 tons | Guangxi, Fangchenggang | Fabrication construction area: 175,000 m². Span: 27 m / 30 m |
| 9 | The 150,000-ton-per-year copper smelting project of Guangxi Nam Quoc Cooperative Co., Ltd. | Approximately 1,600 tons | Guangxi, Chongzuo | Prefabricated steel-framed factory / Multi-story frame structure (height: 51 m) |
| 10 | Thuy Truc Industrial Park Project, Fangcheng Port Economic Zone, Package 2: Standard Factories CF-2/CF-3/CF-4 | Approximately 9,000 tons | Guangxi, Fangchenggang | Prefabricated steel-framed factory, with a construction area of 60,000 m². |
| 11 | No. 2, Xingdong Ethnic Health Park, Guizhou Province | Approximately 4,500 tons | Guizhou, Anshun | Pipe truss structure |
| 12 | High-Grade Stainless Steel Products Industrial Park, Long Dam Industrial Park, Ngoc Lam | Approximately 1,900 tons | Guangxi, Yulin | Prefabricated steel frame structure / 4-story steel frame structure |
| 13 | Integrated Service Complex Project, National-Level Prefabricated Architecture Industrial Park, Fumin District, Yulin City | Approximately 4,500 tons | Guangxi, Yulin | Prefabricated steel frame structure |
| 14 | Yibao Investment Development Co., Ltd. Factory, Jingxi County, Guangxi | Approximately 6,000 tons | Guangxi, Jingxi | Prefabricated steel frame factory |
| 15 | Mandrel Mill Workshop, 300,000-ton Pipe Manufacturing Project, Xingtan, Guangdong | Approximately 2,400 tons | Guangdong, Yangchun | Prefabricated steel frame structure |
| 16 | Phase 1 of the Fangcheng Port Nickel Alloy Project: Main Building for Drying Lines 1 and 2, Unified Coal Storage Facility, Coal Decontamination Yard, and Auxiliary Materials Yard | Approximately 1,400 tons | Guangxi, Fangchenggang | Prefabricated steel frame structure |
| 17 | Guangxi Shenglong Metallurgy Co., Ltd. – Projects for the renovation of rebar rolling mills, the main plant building, etc. | Approximately 2,100 tons | Guangxi, Fangchenggang | Steel frame structure |
| 18 | Phase 2 Expansion Project of the Fangchenggang Power Plant, Guangxi | Approximately 2,600 tons | Guangxi, Fangchenggang | Steel frame structure |
| 19 | Liuzhou Light Rail, Guangxi | Approximately 1,200 tons | Guangxi, Liuzhou | Bridge structure |
| 20 | Steel structural works for the hydraulic assembly plant of Dongfeng Liuzhou Motor’s vehicle parts, PV and CV components. | Approximately 2,500 tons | Guangxi, Liuzhou | Prefabricated steel frame structure |
| 21 | Welding and Pressing Complex Building, Automobile Parts Manufacturing Facility, Ha Tay Industrial Park, Wuling Liuzhou Automobile Co., Ltd. | Approximately 3,000 tons | Guangxi, Liuzhou | Prefabricated steel frame structure |
| 22 | Liuqi Liuzhou Transportation Co., Ltd. | Approximately 1,400 tons | Guangxi, Liuzhou | Prefabricated steel frame structure |
| 23 | Xinyang Glass Deep Processing Joint Venture, Guangxi | Approximately 1,600 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 24 | Porsche 4S Dealer, Nanning, Guangxi | Approximately 1,300 tons | Guangxi, Nanning | Steel frame structure, construction area of 5,000 m² |
| 25 | The 300,000-ton-per-year beer project of Budweiser InBev Beer Co., Ltd. (Nanning) | Approximately 2,800 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 26 | Steel Structure Project for the Nanning High-Tech Industrial Zone Ecological Park | Approximately 2,200 tons | Guangxi, Nanning | Steel frame structure |
| 27 | The 300,000-ton-per-year glass product project of Nanning Yuebo Glass Industry Co., Ltd. | Approximately 1,800 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 28 | Specialized steel structure project for a simple industrial workshop and an outdoor steel pipe truss, part of the simple industrial workshop construction project undertaken by Dingjin Food Co., Ltd. (Khang Sifu) in Nanning. | Approximately 1,100 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 29 | Workshop No. 1, Phase 1, South-South New Materials Deep Processing Technology Renovation Project for Electric Vehicles, Guangxi | Approximately 1,800 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 30 | Construction Project for the Main Workshop of Baijing (Nature) Wood Flooring Co., Ltd., Guangxi | Approximately 1,500 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 31 | Deli/Lelin Forestry Development Co., Ltd., Guangxi | Approximately 2,000 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 32 | Production Workshop for the Two-Piece Can Project of COFCO Nanning Canning Co., Ltd. | Approximately 1,100 tons | Guangxi, Nanning | Prefabricated steel frame structure |
| 33 | Stora Enso Guangxi Forestry and Paper Integrated Project in Beihai | Approximately 1,200 tons | Guangxi, Beihai | Pipeline support structure |
| 34 | Chengde Beihai Nickel Co., Ltd. (Phase 4 of the Ming Nickel-Alloy Project) | Approximately 1,600 tons | Guangxi, Beihai | Prefabricated steel frame structure |
| 35 | Overpasses 1#, 2#, 3#, and 4#, and the canopy at Beiguilin Railway Station | Approximately 3,600 tons | Guangxi, Guilin | Steel-structured canopy for railway platforms / docks |
| 36 | New Construction Project: Phase 1 Factory Complex for Jingui Paper and Pulp | Approximately 2,500 tons | Guangxi, Qinzhou | Prefabricated steel frame structure |
| 37 | Jiaofeng Chemical Co., Ltd., Lingshan, Guangxi | Approximately 3,200 tons | Guangxi, Qinzhou | Prefabricated steel frame structure |
| 38 | Main Building of the Beibu Gulf Center, Qinzhou | Approximately 1,000 tons | Guangxi, Qinzhou | Steel frame structure |
| 39 | Steel structure works for the painting workshop, the final assembly workshop, the manufacturing test workshop, and the adjustment and inspection workshop of Lishun Machinery, Qinzhou. | Approximately 2,500 tons | Guangxi, Qinzhou | Prefabricated steel frame structure |
| 40 | SDIC Qinzhou Port Power Plant Phase 2 Project | Approximately 1,500 tons | Guangxi, Qinzhou | Prefabricated steel frame structure |
| 41 | Project to convert land for the Modern Specialized Agricultural Demonstration Zone, the Mango Park Area in Dien Dong District— including the Comprehensive Service Building at the China Mango Trading Center and the International Exchange Center of the China Mango Exhibition Park. | Approximately 2,000 tons | Guangxi, Baise | Steel frame structure |
| 42 | Guangyin Aluminum Co., Ltd., Baise, Guangxi | Approximately 1,200 tons | Guangxi, Baise | Prefabricated steel frame structure |
| 43 | Hongrun Chemical Technology Co., Ltd., Guangxi: Dissolution Workshop, Synthesis Workshop, Ammonium Chloride Warehouse, Iron Dioxide Warehouse, and Precious Metals Workshop | Approximately 1,100 tons | Guangxi, Baise | Prefabricated steel frame structure |
| 44 | China-ASEAN Agricultural Products Trading Center (Baise) (Cold Storage No. 4) | Approximately 1,500 tons | Guangxi, Baise | Pipe truss structure |